Sistem Pembayaran Kontrak kerja pembuatan Pagar Panel Beton (Studi Pada PG Kebon Agung Malang)

  • Arif Wahyudi Universitas Islam Balitar
Abstract views: 500 , pdf downloads: 791
Keywords: Accounting Information System, Employment Contract, Termin

Abstract

This research was conducted to analyze the work contract payment system in the manufacture of concrete panel fences at PG Kebon Agung Malang so that it can provide information in the form of relevant data, have timeliness, are accurate and useful for the wearer. The qualitative approach used in this research is based on primary data by obtaining data directly from resource persons and using secondary data whose data sources are documents, notes, and other supporting data. The results of this study explain the accounting information system in the form of a system flow chart that explains how the flow of the work contract payment system in making concrete panel fences at Kebon Agung PG starts from CV offering a tender, after being determined the tender winner, the user gives a tender winner letter so that the CV is the winner of the tender. can start his work. After the work is 92.5% completed, CV makes a report of completion of work as evidence that CV has completed part of its project and submits payment by including invoices, receipts, tax invoices, minutes, and SPK to the user to get a blank cash payment request for the first term . Payment of terms for bothparties CV makes a retention report (retention) as the completion of the 7.5% work submitted to the user along with a work agreement letter and a letter of completion of SP work. 

Downloads

Download data is not yet available.

References

Agus Mulyanto. 2009. Sistem Infomasi Konsep dan Aplikasi. Yogyakarta. Pustaka Belajar

Anwar Sanusi. 2011. Metodologi Penelitian Bisnis. . Jakarta Selatan. Salemba Empat

Arikunto, S. 2016. Prosedur Penelitian Suatu Pendekatan Praktik. Jakarta. Rineka Cipta

Baridwan, Zaki. 2008. Sistem Akutansi Penyusunan Prosedur dan Metode. Yogyakarta: BPFE

Baridwan, Zaki. 2010. Sistem Akuntansi. Edisi Kelima. Yogyakarta: BPFE

Bodnar. 2010. Accounting Information System. Yogyakarta. ANDI

Diana, Anastasia., Lilis Setiawati. 2011. Sistem Informasi Akuntansi. Perancangan, Proses, dan Penerapan. Edisi 1. Yogyakarta: ANDI

H.M Jogiyanto. 2010. Analisis dan Desain Sistem Informasi. Yogyakarta. Andi Onset

Iskandar. 2009. Metodologi Penelitian Kualitatif. Jakarta. GP Press

Jogiyanto Hartono. 2009. Analisis dan Sistem Informasi. Yogyakarta. ANDI

Marshal B. Romney, dan Paul John Stein Bart. 2015. Sistem Informasi Akuntansi.Edisi 13. Jakarta Selatan. Salemba Empat

Mursyidi. 2010. Akuntansi Dasar. Bogor: Ghalia Indonesia.

Mulyadi. 2016. Sistem Akuntansi. Edisi 4. Jakarta. Salemba Empat

Romney, Marshal B., dan Paul John Steinbert. 2014. Accounting Information System, 13 th ed. England. Pearson Educational Limited.

Salim H.S, “Hukum Kontrak: Teori dan Teknik Penyusunan kontrak,” cet. II (Jakarta: Sinar Grafika, 2004:3)

Soemarso S.R. 2004. Akuntansi Suatu Pengantar. Jakarta: Salemba Empat

Subekti “Hukum Perjanjian,” cet. XII (Jakarta: PT. Intermasa, 1990:1)

Sugiyono. 2010. Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung. Alfabeta

Sugiyono. 2014. Memahami Penelitian Kualitatif. Bandung. Alfabeta

Susanta.2007. Panduan Lengkap Membangun Rumah. Cimanggis Depok.Penebar Swadata.

Yakub. 2012. Pengantar Sistem Informasi. Yogyakarta. Graha Ilmu

PlumX Metrics

Published
2021-01-13
How to Cite
Wahyudi, A. (2021). Sistem Pembayaran Kontrak kerja pembuatan Pagar Panel Beton (Studi Pada PG Kebon Agung Malang). AKUNTABILITAS: Jurnal Ilmiah Ilmu-Ilmu Ekonomi, 12(2), 39-49. https://doi.org/10.35457/akuntabilitas.v12i2.1298

Most read articles by the same author(s)