[1]
S. Suprianto, B. Andari, and Y. Sulistyawati, “CALCULATION OF PRODUCTION COST IN UD. USAHA BARU WITH FULL COSTING METHOD”, Jares, vol. 4, no. 1, pp. 28-42, Mar. 2019.